ONGC Energy Centre completed drilling the second geothermal well to a depth of 1,000 metres in Ladakh's Puga Valley.
The drilling operation was executed at an altitude of over 14,000 feet within a month, improving on previous timelines and costs.
The second well will directly support the development of India's first 1-megawatt electric pilot geothermal power plant.
