The non-availability of the grid has majorly impaired the operational strength of some wind projects, given the sizable installed capacities. The failure to address grid issues can gradually destabilise the solar projects in the ensuing years. Grid curtailment is unpredictable, thus the ill-equipped developers have been grappling to manage their finances, barring the large ones. The uncertain source supply (uncontrollable) and grid non-availability (controllable), despite its ‘must run’ status, is slowly shaking the fledgling renewable energy sector.