Adani Power has received a Letter of Intent from Bihar State Power Generation Company to develop and operate a 2,400 MW greenfield thermal power plant in Bhagalpur, Bihar.
The power will be supplied to North and South Bihar power distribution companies from a 3x800 MW ultra-supercritical plant.
Adani Power emerged as the lowest bidder with a final power supply price of ₹6.075 per kWh and will use coal from a SHAKTI policy-linked allocation.
The project is expected to create 10,000–12,000 jobs during construction and 3,000 in operation.