At least one major stretch of NH-66 in Kerala was recently found to be structurally compromised not because of flawed construction or weak materials, but because critical soil analysis was either inadequate or misinterpreted. According to reports filed in the Kerala High Court, the soil used in the highway embankment was saturated loamy soil that lacked bearing capacity, resulting in repeated ground slips and strain even before full commissioning was possible.