India’s power capacity may exceed 1,000 GW by 2034–35, double the current 490 GW, according to CEA Chairperson Ghanshyam Prasad.
Transmission expansion is the biggest challenge, requiring HVDC systems and upgrades from 765 kV to 1,150 kV, with projects due by 2025–27.
The CEA has launched a Resource Adequacy Plan to better align generation with demand.
US envoy Xiabing Feng said India–US cooperation could boost energy security, with focus on oil, gas, and nuclear power.