Gujarat’s installed power capacity — including wind, solar and hydro — currently meets about 58% of the state’s electricity demand, according to TOI. According to another TOI report, Gujarat is planning to invest Rs 29,000 crore to develop the third Green Energy Corridor (GEC-III) with plans to transmit 16,500MW of renewable power from across the state.